---
title: "DataVolt signs $5bn deal for 1.5GW AI data center campus at NEOM's Oxagon"
url: "https://cicadaconsultancy.online/en/news/datavolt-neom-oxagon-5bn-2025"
language: "en"
event_date: "2025-02"
published: "2026-10-03"
last_verified: "2026-10-03"
category: "Giga-projects"
publisher: "Cicada (cicadaconsultancy.online)"
license: "CC BY 4.0"
---

# DataVolt signs $5bn deal for 1.5GW AI data center campus at NEOM's Oxagon

- Event date: February 2025 (2025-02)
- Topic: Giga-projects
- In this story: DataVolt, NEOM, Oxagon
- URL: https://cicadaconsultancy.online/en/news/datavolt-neom-oxagon-5bn-2025

In February 2025 NEOM and DataVolt agreed a $5 billion net-zero, AI-focused data center campus at Oxagon, planned to reach 1.5 GW with a first 300 MW phase operational in 2028, powered by renewable energy and using advanced cooling. Oxagon leases the land and supplies infrastructure, and the Red Sea site gives access to subsea fiber. Reporting in 2026 describes a 100 MW phase with HUMAIN within a 360 MW campus at Oxagon.

## Key figures

- investment: $5 bn
- planned capacity: 1,500 MW
- first phase: 300 MW

## Sources

1. [NEOM signs deal with DataVolt to build $5bn data centre in Oxagon](https://meconstructionnews.com/62668/neom-signs-deal-with-datavolt-to-build-5bn-data-centre-in-oxagon) — Middle East Construction News
2. [Saudi firm to invest US$5b in AI data centre for futuristic NEOM city](https://www.malaymail.com/news/tech-gadgets/2025/02/12/saudi-firm-to-invest-us5b-in-ai-data-centre-for-futuristic-neom-city/166453) — Malay Mail (AFP), 2025-02-12

Archive report. Written in 2026 from contemporary sources and dated to the day the event happened.

---

Cicada · The signal in Saudi AI.
License: CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/) · Full archive for language models: https://cicadaconsultancy.online/llms-full.txt
