{"publisher":"Cicada (cicadaconsultancy.online)","license":"https://creativecommons.org/licenses/by/4.0/","attribution":"Cite as: Cicada (cicadaconsultancy.online)","docs":"https://cicadaconsultancy.online/llms.txt","item":{"id":"humain-xai-500mw-2025","event_date":"2025-11-19","published":"2026-10-03","category":"datacenters","importance":3,"title":{"en":"xAI and HUMAIN to build 500MW data center in Saudi Arabia","ar":"«إكس إيه آي» وهيوماين تبنيان مركز بيانات بسعة 500 ميغاواط في السعودية"},"summary":{"en":"Elon Musk announced at the US-Saudi Investment Forum on 19 November 2025 that xAI, HUMAIN and Nvidia will build a 500 MW AI data center in Saudi Arabia, powered by Nvidia chips. The agreement includes deploying xAI's Grok models across the Kingdom, described as the first nationwide Grok deployment. No site or timeline has been disclosed.","ar":"أعلن إيلون ماسك في منتدى الاستثمار السعودي الأمريكي في 19 نوفمبر 2025 أن «إكس إيه آي» وهيوماين وإنفيديا ستبني مركز بيانات للذكاء الاصطناعي بسعة 500 ميغاواط في السعودية، يعمل بشرائح إنفيديا. ويتضمن الاتفاق نشر نماذج Grok التابعة لـ«إكس إيه آي» في أنحاء المملكة، في أول عملية نشر وطنية من نوعها بحسب الوصف المعلن. ولم يُكشف عن الموقع أو الجدول الزمني."},"entities":["xAI","HUMAIN","Nvidia","Elon Musk"],"figures":[{"label":"capacity","label_ar":"السعة","value":500,"unit":"MW"}],"sources":[{"url":"https://w.media/elon-musks-xai-to-build-500-mw-data-center-in-saudi-arabia/","publisher":"W.Media","title":"xAI and HUMAIN to build 500 MW data center in Saudi Arabia","published":null},{"url":"https://baxtel.com/news/xai-and-humain-to-build-500mw-saudi-arabia-data-center","publisher":"Baxtel","title":"xAI and HUMAIN to build 500MW Saudi Arabia data center","published":null}],"verification":"corrected","urls":{"en":"https://cicadaconsultancy.online/en/news/humain-xai-500mw-2025","ar":"https://cicadaconsultancy.online/ar/news/humain-xai-500mw-2025","markdown_en":"https://cicadaconsultancy.online/en/news/humain-xai-500mw-2025.md","markdown_ar":"https://cicadaconsultancy.online/ar/news/humain-xai-500mw-2025.md"},"image":"https://cicadaconsultancy.online/images/articles/humain-xai-500mw-2025.jpg"}}