{"publisher":"Cicada (cicadaconsultancy.online)","license":"https://creativecommons.org/licenses/by/4.0/","attribution":"Cite as: Cicada (cicadaconsultancy.online)","docs":"https://cicadaconsultancy.online/llms.txt","item":{"id":"datavolt-humain-oxagon-construction-2026","event_date":"2026-08-31","published":"2026-10-03","category":"gigaprojects","importance":2,"title":{"en":"DataVolt and HUMAIN start building 100MW AI data center at NEOM's Oxagon","ar":"«داتافولت» وهيوماين تبدآن بناء مركز بيانات للذكاء الاصطناعي بسعة 100 ميغاواط في أوكساجون بنيوم"},"summary":{"en":"DataVolt and HUMAIN launched construction of a 100 MW AI data center at Oxagon in NEOM, the first part of a 360 MW phase of the campus, with the first 100 MW expected to be available in 2028. The project was announced at LEAP 2026, MEED reported on 1 September, and the wider campus is planned to reach 1.5 GW. HUMAIN CEO Tareq Amin said construction was under way, and DataVolt CEO Rajit Nanda called the groundbreaking an important milestone. The facility is to use renewable energy, advanced cooling and subsea cable links to Europe and Africa.","ar":"أطلقت «داتافولت» وهيوماين أعمال بناء مركز بيانات للذكاء الاصطناعي بسعة 100 ميغاواط في أوكساجون بنيوم، وهو الجزء الأول من مرحلة بسعة 360 ميغاواط من الحرم، على أن تتوافر أول 100 ميغاواط في 2028. وأُعلن عن المشروع في مؤتمر ليب 2026، بحسب ما نشرته «ميد» في 1 سبتمبر، ومن المخطط أن تبلغ سعة الحرم الأوسع 1.5 غيغاواط. وقال الرئيس التنفيذي لهيوماين طارق أمين إن أعمال البناء جارية، ووصف الرئيس التنفيذي لـ«داتافولت» راجيت ناندا بدء الأعمال بأنه محطة مهمة. وسيعتمد المركز على الطاقة المتجددة والتبريد المتقدم وروابط الكابلات البحرية مع أوروبا وأفريقيا."},"entities":["DataVolt","HUMAIN","NEOM","Oxagon"],"figures":[{"label":"first phase capacity (first available 2028)","label_ar":"سعة المرحلة الأولى (تتوافر في 2028)","value":100,"unit":"MW"},{"label":"planned phase capacity","label_ar":"سعة المرحلة المخططة","value":360,"unit":"MW"},{"label":"planned campus capacity","label_ar":"سعة الحرم المخطط","value":1.5,"unit":"GW"}],"sources":[{"url":"https://w.media/datavolt-and-humain-break-ground-on-first-ai-data-center-in-neom/","publisher":"W.Media","title":"DataVolt and HUMAIN break ground on first AI data center in NEOM","published":"2026-08-31"},{"url":"https://www.meed.com/humain-and-datavolt-start-oxagon-data-centre-work","publisher":"MEED","title":"Humain and DataVolt start Oxagon data centre work","published":null}],"verification":"corrected","urls":{"en":"https://cicadaconsultancy.online/en/news/datavolt-humain-oxagon-construction-2026","ar":"https://cicadaconsultancy.online/ar/news/datavolt-humain-oxagon-construction-2026","markdown_en":"https://cicadaconsultancy.online/en/news/datavolt-humain-oxagon-construction-2026.md","markdown_ar":"https://cicadaconsultancy.online/ar/news/datavolt-humain-oxagon-construction-2026.md"},"image":"https://cicadaconsultancy.online/images/articles/datavolt-humain-oxagon-construction-2026.jpg"}}