{"publisher":"Cicada (cicadaconsultancy.online)","license":"https://creativecommons.org/licenses/by/4.0/","attribution":"Cite as: Cicada (cicadaconsultancy.online)","docs":"https://cicadaconsultancy.online/llms.txt","item":{"id":"datacentre-capacity-467mw-q1-2026","event_date":"2026-03","published":"2026-10-03","category":"datacenters","importance":1,"title":{"en":"Operational data center capacity reaches 467MW in Q1 2026, per official figures","ar":"سعة مراكز البيانات التشغيلية تبلغ 467 ميغاواط في الربع الأول من 2026 بحسب أرقام رسمية"},"summary":{"en":"Saudi Arabia's operational data center capacity reached 467 MW in the first quarter of 2026, up from 68 MW in 2021, according to official Saudi figures cited by Fortune in September 2026. An independent analysis citing Ministry of Communications and Information Technology data puts end-2025 capacity at 440 MW across more than 60 facilities run by more than 20 companies, with 79% in Dammam (41%) and Riyadh (38%). The analysis stresses that announced capacity far exceeds energized capacity.","ar":"بلغت سعة مراكز البيانات التشغيلية في السعودية 467 ميغاواط في الربع الأول من 2026، ارتفاعاً من 68 ميغاواط في 2021، بحسب بيانات سعودية رسمية أوردتها «فورتشن» في سبتمبر 2026. ويضع تحليل مستقل يستند إلى أرقام وزارة الاتصالات وتقنية المعلومات السعة في نهاية 2025 عند 440 ميغاواط موزعة على أكثر من 60 منشأة تديرها أكثر من 20 شركة، مع تركز 79 في المائة منها في الدمام (41 في المائة) والرياض (38 في المائة). ويؤكد التحليل أن السعة المعلنة تفوق بكثير السعة المشغّلة فعلياً."},"entities":["MCIT","Dammam","Riyadh"],"figures":[{"label":"operational capacity Q1 2026","label_ar":"السعة التشغيلية في الربع الأول 2026","value":467,"unit":"MW"},{"label":"operational capacity 2021","label_ar":"السعة التشغيلية في 2021","value":68,"unit":"MW"}],"sources":[{"url":"https://fortune.com/2026/09/09/saudis-humain-turns-to-outside-investment-as-the-kingdom-reins-in-fiscal-spending/","publisher":"Fortune","title":"Saudi's Humain seeks external investment to fuel its AI ambitions","published":"2026-09-09"},{"url":"https://vision2030.ai/analysis/saudi-data-centre-capacity-megawatts/","publisher":"vision2030.ai (independent analysis)","title":"Saudi Data Center Capacity: The Real Megawatts","published":null}],"verification":"corrected","urls":{"en":"https://cicadaconsultancy.online/en/news/datacentre-capacity-467mw-q1-2026","ar":"https://cicadaconsultancy.online/ar/news/datacentre-capacity-467mw-q1-2026","markdown_en":"https://cicadaconsultancy.online/en/news/datacentre-capacity-467mw-q1-2026.md","markdown_ar":"https://cicadaconsultancy.online/ar/news/datacentre-capacity-467mw-q1-2026.md"},"image":"https://cicadaconsultancy.online/images/articles/datacentre-capacity-467mw-q1-2026.jpg"}}